In 2010, DP Energy contracted TULLOCH to be the lead engineering firm for the  development of the Bow Lake Wind Farm, which is a 60MW project.  This project was acquired by BluEarth.

TULLOCH’s involvement includes the municipal class environmental assessment, permitting all required pits and quarries, administering the aerial LiDAR survey, preparing preliminary road designs, administering the geotechnical program, and providing environmental monitoring.

In advance of construction, a complete existing road condition report was prepared to be used as a  reference document in the EPC agreement. TULLOCH provided full owner’s representative contract administration and inspection services when construction started in the Spring of 2014.

Environmental monitoring, Crown Land Survey services, and as-build surveys will also be provided at completion of the project.

TULLOCH continues to play an integral role in this project as construction is complete and is in the final commissioning and project closeout phase.

TULLOCH has maintained its role as the owners engineer and has overseen all of the development and construction of this project.